Home
About Us
Directors
Memberships & Accreditations
Financial Highlights
What people say about us
Quality Assurance
Health & Safety
Environment
Downloads
Latest News
Contract Announcements
Social & Community
What We Do
Civil Engineering
Water Treatment
Highways
Structures
Specialist Activities
Coastal & River
Infrastructure
Environmental Improvements
Airports
Railways
Building
Contact Us
Southampton HQ
Plymouth
Gatwick
Heathrow
Stansted
Dartford
Swansea
Careers
Current Vacancies
Why work for us?
Vacancy Alert sign up
Equal Opportunities
Home
>
What We Do
>
Building
>
Building Overview
>
Chickerell Camp
What We Do
Civil Engineering
Airports
Railways
Building
Chickerell Camp
Client
Defence Estates
Main Contractor
Dyer & Butler
Duration
13 Months
Location
Weymouth, Dorset
Office Responsible
Southampton HQ
Description
The project was awarded on a best value basis where the quality, time and cost were all equally evaluated by the client’s team.
The works were for the design and build of a new catering facility, with associated external works, the creation of a new ablutions block and the refurbishment of an existing ablutions block, the armoury and the ammunitions store.
The construction works were spread over the entire training camp which was in use throughout the contract duration whereby all works and deliveries were carefully planned and coordinated with the staff running the site to minimise disruption and risks to those using the training facility.
Due to the location of the works careful consideration had to be given to the selection of materials to withstand a marine environment.
The catering facility was designed to accommodate up to 350 people for any one meal. This involved a state of the art catering package and the associated complicated mechanical, electrical and ventilation systems for the kitchen.
The use of grey water recycling has been installed on the scheme.
Works were undertaken on an active army base necessitating close liaison with the military personnel to ensure complete safety and minimum disruption.