Fullerton WWTW

Works carried out on behalf of 4Delivery Ltd on the substantial upgrade of Fullerton WWTW.
The works consisted of formwork, reinforcement and concreting of:
- Large Tertiary Sound Filter structure
- Below ground COPA Trawl Chamber
- Twin 21m diameter Nitrifying Trickling Filter Bases
- Twin 23m diameter by 3m Humus Tanks
- Numerous Ancillary Equipment Bases and Hard-standings to Cess Reception Area and MCC Control Panels.