Home
About Us
Directors
What people say about us
Quality Assurance
Health & Safety
Environment
Downloads
Latest News
What We Do
Civil Engineering
Water Treatment
Highways
Structures
Specialist Activities
Coastal & River
Infrastructure
Environmental Improvements
Airports
Railways
Building
Contact Us
Southampton HQ
Plymouth
Gatwick
Heathrow
Swansea
Swindon
Careers
Current Vacancies
Why work for us?
Vacancy Alert sign up
Equal Opportunities
Home
>
What We Do
>
Civil Engineering
>
Water Treatment
>
Maresfield
What We Do
Civil Engineering
Water Treatment
Highways
Structures
Specialist Activities
Coastal & River
Infrastructure
Environmental Improvements
Airports
Railways
Building
Maresfield WWTW
Client
4 Delivery Limited
Main Contractor
Dyer & Butler
Duration
6 Months
Location
Maresfield, Sussex
Office Responsible
Southampton HQ
Description
Refurbishment of existing Live WWTW - The works included maintaining the live flows through the works. The package included the formwork, reinforcement and concreting of various process structures.
Twin 6m diameter by 6m deep Primary Settlement Tanks, including earthworks excavation and
• support.
Associated above ground Distribution Chambers and Flow Pipework.
Twin 8m diameter by 8m deep Humus Tanks, including earthworks excavation and support.
Associated Distribution Chamber, Telemetry and Flow Pipework.
Refurbishment proposal for a RC lining to existing failed Storm Storage Tank - phased with system requirements.
Installation of all new Cable Ducts and Drawpits.
Installation of all new system Flow Pipework and Pressure Pipelines.
Replacement of failed Hard-standing Access Road and Earthwork Landscaping
Website design by
Clickfire
© Dyer & Butler 2012. All rights reserved