Below are some case studies illustrating the diverse range of projects we have undertaken across the business.

Days Pottle Pond, Exeter

This scheme consisted of the rehabilitation and upsizing of the drainage along a 3.5km stretch of the A30 between the M5 and the A377 junction,...
Read more
Days Pottle Pond, Exeter

RAF Odifam Floodlighting

This project comprised of the replacement of the two existing high mast floodlighting towers, head gear and electrical cabling and the installation of 3 new...
Read more
RAF Odifam Floodlighting

New Cross Substation Fire Man

The project consisted of the provision of a new fire water main to connect to a new fire hydrant and existing fire protection system water...
Read more
New Cross Substation Fire Man

Gatwick Stream Attenuation Scheme

Client: Gatwick Airport Ltd Value: £0.4m Contract: NEC3 Enabling works package for Gatwick Stream Flood Attenuation project.   Dyer & Butler delivered an enabling works package for the Gatwick...
Read more
Gatwick Stream Attenuation Scheme

Dogmersfield Canal Improvements

The project comprised of the construction of two sheet piled retaining walls on either side of the canal, following a landslip into the canal channel....
Read more
Dogmersfield Canal Improvements

Lancing Platform Extension

Dyer & Butler were awarded the contract to design and construct 3 platform extensions at Lancing, Cooksbridge and Goring-by-Sea Stations to support the Gatwick Airport...
Read more
Lancing Platform Extension