A4 Shepherds House East Bridge, Wokingham

A4 Shepherds House East Bridge, Wokingham

Client: Wokingham Borough Council Value: £0.97m Contract: NEC3 Option A Renovation of an existing elliptical brick arch bridge designed by Isambard Kingdom Brunel and constructed in the 1830s. Works comprised extensive brickwork repairs, strengthening of the existing concrete deck, services diversions and full depth carriageway reconstruction.   Dyer & Butler undertook the refurbishment of the A4 Shepherds House...

Read more
Ashley Road Overbridge Reconstruction, Bournemouth

Ashley Road Overbridge Reconstruction, Bournemouth

Client: Network Rail Value: £0.72m Contract: RT21 Download PDF Demolition and reconstruction of the existing road over rail bridge deck during a 52 hour possession. The works also included waterproofing to the new bridge deck, new surfacing and services diversions.   Ashley Road Overbridge is a road over rail bridge on a very busy arterial road which connects the...

Read more
Eastern Docks Rail Modification, Southampton

Eastern Docks Rail Modification, Southampton

Client: Associated British Ports Value: £1.3m Contract: ICE 6th Edition Download PDF Removal and subsequent relaying of two rail sidings over a distance of 1.1km adjacent to the Queen Elizabeth 2nd Terminal in the Eastern Docks, Southampton. The work was completed in four phases comprising the removal of existing rails, sleepers and surfacing, and replacing with new...

Read more
Maidstone West Station Retaining Wall

Maidstone West Station Retaining Wall

Client: Network Rail Value: £0.77m Contract: NR4 MT Download PDF Installation of sheet piles and gabion basket retaining wall at the site of a deep seated rotational slip. The works included stabilisation of the failed existing temporary works, protection of HV cables in troughing units along the front of the retaining wall, installation of sheet piling, excavation...

Read more
MR60 Underbridge, Northwood

MR60 Underbridge, Northwood

Client: London Underground Limited Value: £0.99m Contract: NEC3 Short Form Download PDF Refurbishment of the London Underground Metropolitan Line underbridge between Northwood Hills and Northwood. The works comprised cleaning, concrete works, brickwork repairs and re-painting of the MR60 underbridge.   Structure MR60 is an underbridge located approximately 650 meters form Northwood Station and 850 metres from Northwood Hills Station....

Read more
Abbey Water Retaining Wall, Romsey

Abbey Water Retaining Wall, Romsey

Client: Hampshire County Council Value: £0.16 million Contract: NEC3 Option B Download PDF Demolition of an existing concrete retaining wall and construction of a new 69 linear metre brick faced concrete retaining wall with Purbeck Stone coping stones, pedestrian handrail and associated resurfacing of the existing carriageway.   The project, which was undertaken for Hampshire County Council as part...

Read more
Basingstoke Canal Term Contract

Basingstoke Canal Term Contract

Client: Surrey County Council and Hampshire County Council Value: £0.8 million Contract: NEC3 Option A Download PDF Provision of a comprehensive canal maintenance service for maintenance an improvement of the canal including 144 embankments, 53 cuttings, 57 culverts, 27 weirs and sluices and 29 sets of lock gates.   Provision of a comprehensive canal maintenance service for maintenance and...

Read more
Environment Agency Wales Minor Works Framework

Environment Agency Wales Minor Works Framework

Client: Environment Agency Value: £2.1 million Contract: NEC 3 Minor Works Option B Download PDF Dyer & Butler deliver engineering works and maintenance activities within the environmentally sensitive areas under the minor works framework. Typical projects include stop log structures, water hatch structure, bypass channels, flood alleviation schemes and water meadows.   The Minor Framework Agreement for the Environment...

Read more
Dovercourt Bridge and Cycleway

Dovercourt Bridge and Cycleway

Client: Bristol City Council Value: £0.3m Contract: ICE 6th Edition (Design & Build) Download PDF Design and Construct project providing a new bow arch cycleway bridge with 44m span warren truss on piled abutments with 110m of cycleway construction, including associated earthworks, surfacing, and street lighting.   The Dovercourt Bridge project is part of a wider Cycling City Scheme...

Read more
Exe Estuary Trail, Lympstone to Nutwell

Exe Estuary Trail, Lympstone to Nutwell

Client: Devon County Council Value: £1.16m Contract: NEC3 Option B Download PDF New cycleway construction over a 0.8km stretch adjacent to the existing railway as part of the Exe Estuary Trail in East Devon. The work included boardwalk sections, reinforced soil embankments, surfacing work, and construction of a 60m steel ramp and 21m span bridge on reinforced...

Read more

Latest News

M Group Services Rail Businesses Sign Up to Railway Mental Health Charter
Antagrade, Dyer & Butler and KH Engineering Services, three businesses from the M Group Services Transport Division, have signed up...

View More

"From tender award to handback, they acted in a professional, courteous manner at all times and will be considered for future works without hesitation."

Brian Sheldon,
Works Delivery Manager, Civils LNE Buildings & Civils Minor Works - Infrastructure Maintenance