Below are some case studies illustrating the diverse range of projects we have undertaken across the business.

Tilbury Terminal Location

Port of Tilbury is located on the River Thames and is the principle port for London with extensive facilities for containers, paper import, grain and...
Read more
Tilbury Terminal Location

Tithebarn Lane Footbridge

The project comprised the design and construction of a new 60m span steel pedestrian/cycle bridge over the M5 motorway, just north of Junction 29 in...
Read more
Tithebarn Lane Footbridge

Totnes Station AFA Footbridge

The project comprised the design and construction of a new ‘Access For All’ (AFA) footbridge replacement scheme at the Victorian station at Totnes improving accessibility...
Read more
Totnes Station AFA Footbridge

Valley Gardens Infrastructure

This project focuses on two strategic routes in the centre of Brighton which aims to simplify the existing highway network through Valley Gardens, enhancing the...
Read more
Valley Gardens Infrastructure

GASHCO Interceptor Installation, Gatwick

Client: GASHCO Value: £0.6m Contract: ICE Conditions of Contract 7th Edition Excavation and installation of temporary works to enable the placing of three no. full retention interceptors.   The scope...
Read more
GASHCO Interceptor Installation, Gatwick

Cleeve Hill Slope Stabilisation

The project comprised of the slope stabilisation of the B4632 Cleeve Hill, 5km north east of Cheltenham. Since 2014, ongoing deterioration of the B4632 had resulted...
Read more
Cleeve Hill Slope Stabilisation