Case Studies

Case Studies

Below are some case studies illustrating the diverse range of projects we have undertaken across the business.

RETFORD Station AFA

The project comprised of the design and construction of a ‘Access for All’ compliant covered ramp 160m long up to the footbridge north of Platform...
Read more
RETFORD Station AFA

Gatwick Airport Works 2015 - 2021

Installation of Aeronautical Ground Lighting (AGL) - Various Locations Dyer & Butler Electrical has carried out numerous AGL works worth £0.53m at Gatwick Airport. At the...
Read more
Gatwick Airport Works 2015 - 2021

Winterbourne Flood Alleviation

The scheme comprised of the realignment of the Winterbourne Stream and the construction of a 300m long, 2.4m high flood defence bund on the land...
Read more
Winterbourne Flood Alleviation

Newquay Airport Apron Extension

The project was to expand the existing apron by 10,000m² at Cornwall Airport Newquay in preparation for the movement of large aircraft during the G7...
Read more
Newquay Airport Apron Extension

YEOVIL Junction Sidings

This Project was to assist South Western Railway to meet the requirements for a traincrew depot and berthing point at Yeovil Junction. The Works included the...
Read more
YEOVIL Junction Sidings

Penstone Underbridge Replacement

This project formed part of the Western Package 2 works for Network Rail and comprised of the replacement of Penstone Underbridge, a 3-span underbridge, located...
Read more
Penstone Underbridge Replacement